For end users

One contact and one invoice through to delivery.

Most parts lists arrive incomplete. We figure out what's missing and ask once. Then we stay with the job until the panel ships.

Photo: a maintenance technician at an open control panel on the plant floor

Working with us

The questions that went back on a replacement panel request.

Parts Check (sample), Questions

Questions · 6

Please check · 1

Items in your parts list that do not fit together. We have not changed anything — please confirm or correct.

Fuse holdersThe fuses on line 4 (Class CC) have no fuse holder or fuse block on the parts list. Please add one or tell us where they mount.line 4Control fuses

We need information · 5

Not in your parts list — needed to firm the quote.

EnclosureThere is no enclosure on the parts list. Please give the enclosure part number, or its size, NEMA type and material.
Short-circuit current rating (SCCR)Your parts list does not state the panel SCCR. Please give the required SCCR, or the available fault current where the panel is fed.
Motor listPlease send the motor list: tag, horsepower, voltage and full-load current (FLA) of each motor.line 3Pump 1, Pump 2 overloads
What the panel controlsYour parts list does not say what the panel is for. Please tell us what it controls (for example a duplex pump station, a conveyor or an air handler).
Included vs ordered separatelyInclusion of lug / terminal kit is not stated in the catalog for 1 line — confirm with the shop.line 1Main disconnect

Send us whatever you have and we'll work out the rest.

Request a quote Check part numbers